Background Image

MOBIL PRODUCING NIGERIA UNLIMITED-

TENDER OPPORTUNITY: PROVISION OF INTEGRATED FACILITIES MANAGEMENT SERVICES AT LAGOS LOCATIONS

MOBIL PRODUCING NIGERIA UNLIMITED
AN EXXONMOBIL SUBSIDIARY
OPERATOR OF THE NNPC/MPN JOINT VENTURE
TENDER OPPORTUNITY:
PROVISION OF INTEGRATED FACILITIES MANAGEMENT SERVICES AT LAGOS LOCATIONS
NIPEX NUMBER: MPN.00000197

INTRODUCTION
Mobil Producing Nigeria Unlimited (MPN Operator of NNPC/MPN Joint Venture plans to engage the services of a competent and qualified contractor, for the provision of integrated Facilities Management Services at Lagos Locations to support her operations within the NNPC/MPN Joint Venture (JV) acreage for an anticipated contract term of two (2) years plus one (1) year optional extension.

SCOPE OF WORK
The scope of work includes but not limited to the following:
i. Housekeeping- Janitorial, Landscaping Maintenance, Pest Control/fumigation
ii. Furniture Maintenance, Office Moves, Residential Moves
iii. Mail and Courier Handling/Reprographics/Other Tenant Services
iv. Cable TV, Satellite TV and internet Services at residential locations
v. Structural/Building Façade/Civil Maintenance & Repair Painting, Carpentry Roofing Systems etc.
vi. Refurbishment Projects including office layout changes and office moves
vii. Mechanical Maintenance – Life safety Systems, Atrium Hoist System, HVAC, cold rooms etc.
viii. Plumbing including – Pumping System, boreholes, Storage Treatment Plant, Sewage Treatment Plant
ix. Fire Protection-Fire Sprinkler System (Wet & Dry), Fire Alarm
x. Electrical Maintenance- Medium/High Voltage Switchgears, Power Distribution Systems
xi. Power Generator Operations, (24/7) Maintenance and Overhauls, Synchronization Controls
xii. Vertical Transportation Maintenance – Passenger elevators, Cargo/Goods Elevators.

You need to login to view the rest of the content. Please . Not a Member? Join Us

AMERICAN UNIVERSITY OF NIGERIA (AUN)-

REQUEST FOR PROPOSAL TO PROVIDE FACILITY MANAGEMENT SERVICES TO AUN PROPERTIES

AMERICAN UNIVERSITY OF NIGERIA (AUN)
REQUEST FOR PROPOSAL TO PROVIDE FACILITY MANAGEMENT SERVICES TO AUN PROPERTIES

The American University of Nigeria (AUN) is a private university in Yola, Adamawa state of northeastern Nigeria that offers the American style of higher education programs at the undergraduate, graduate, and professional levels. Founded in 2004, it is the first American-style University in sub-Saharan Africa, AUN is accredited by the National Universities Commission and consists of six schools namely:

• School of Arts & Sciences,
• School of Business & Entrepreneurship,
• School of Information Technology & Computing
• School of Law,
• School of Engineering
• School of Graduate Studies.

AUN is a residential campus situated on 2,400 hectares. It is home to approximately 1,200 undergraduate students and 800 faculty and staff members.

The university is seeking the services of qualified Facility Management Services providers for its campus and residence quarters in Yola North and South, Adamawa State.

PROPERTY INFORMATION
The university comprises the following:
138 units of studio flats, one-bedroom flats, two-bedroom flats and three-bedroom fully detached bungalows at the residences and 51 buildings on campus with the following ancillary infrastructure:
(1) Transformers- (28)
(2) Generators- (35)
(3) Electric poles
(4) Borehole facilities
(5) Overhead water storage tanks
(6) Road network
(7) Gatehouse/Security
(8) Perimeter fencing
(9) Streetlights

You need to login to view the rest of the content. Please . Not a Member? Join Us

FAMILY HOMES FUNDS LIMITED (FHFL), ABUJA-

REQUEST FOR PROPOSALS FOR FACILITY MANAGEMENT SERVICES PROVIDER

FAMILY HOMES FUNDS LIMITED (FHFL)
3RD FLOOR SINOKI HOUSE, OPPOSITE MINISTRY OF TRANSPORTATION, ADEMULEGUN STREET CBD, ABUJA
REQUEST FOR PROPOSALS (RFP/HRADM/0020)
FOR FACILITY MANAGEMENT SERVICES PROVIDER

INTRODUCTION
The Family Homes Funds Limited (FHFL) is a social housing initiative promoted by the Federal Government of Nigeria as part of its Social Intervention Programme. The Company is a Limited Liability Company with initial shareholding by the Federal Ministry of Finance and the Nigeria Sovereign Investment Authority. Over the next 4 years, the company aims to invest up to N1.3trn in promoting the development of 500,000 homes for people on low income. In the process, the Company also aims to create up to 1,500,000 jobs.

FHFL seeks to offer an all-round service to beneficiaries of its homes, including facility management service on the estates, post-development.

Hence, the HR and Admin Unit on behalf of FHFL, is seeking the services of qualified Facility Management Services providers for its housing project in Chikun, Kaduna.

The bids should be submitted in accordance with the specifications, terms, and conditions shown in this Request for Proposals (RfP). This RfP is being released to identify an experienced Facility Manager to carry out the services as detailed in this document. Prospective respondents are advised to read this information carefully prior to submitting a proposal.

FAMILY HOMES ESTATES – PROPOSAL LOTS
For the purpose of this RfP, the FHFL estates are in four different locations being: Delta, Kaduna, Kano, and Ogun. The services required shall be rendered in these locations. Bidders are to indicate location(s) of interest in their proposals. A bidder may bid for one or more locations but shall not be assigned more than one location for the provision of services, if selected.
Details of each estate location are provided below:

(1) ISSELE AZAGBA, DELTA STATE
The estate comprises of 650 units of one-bedroom terrace bungalows, two-bedroom semidetached bungalows and three-bedroom semi-detached bungalows with the following ancillary infrastructure:
• Transformers
• Electric poles
• Borehole facilities
• Underground water storage tanks
• Overhead water storage tanks
• Playgrounds
• Road network
• Gatehouse/Security
• Perimeter fencing
• Streetlights

(2) NEW MILLENIUM CITY, CHIKUN KADUNA STATE
The estate comprises of 604 units of one-bedroom terrace bungalows, two-bedroom terrace bungalows three-bedroom terrace duplexes, and three-bedroom semi-detached bungalows with the following ancillary infrastructure:
• Transformers
• Electric poles
• Borehole facilities
• Overhead water storage tanks
• Playgrounds
• Road network
• Gatehouse/Security
• Perimeter fencing
• Streetlights

(3) MUHAMMADU SANUSI II ROYAL ESTATES, DARMANAWA ROYAL CITY, KANO STATE
The estate comprises of 757 units of two-bedroom flats, three-bedroom flats, and three-bedroom fully detached bungalows with the following ancillary infrastructure:
• Transformers
• Electric poles
• Borehole facilities
• Overhead water storage tanks
• Playgrounds
• Road network
• Gatehouse/Security
• Perimeter fencing
• Central Sewage System
• Streetlights

(4) NEW MAKUN CITY, OGUN STATE
The estate comprises of 1020 units of studio flats, one-bedroom flats, two-bedroom flats and three-bedroom fully-detached bungalows with the following ancillary infrastructure:
• Transformers
• Electric poles
• Borehole facilities
• Overhead water storage tanks
• Playgrounds
• Road network
• Gatehouse/Security
• Perimeter fencing
• Streetlights

SCOPE OF WORK
The company which is selected to perform the work will have to carry out the following functions:
(1.1) Control and management of environmental and safety issues relating to the Facility;
(1.2) Inspection and testing of fire safety equipment and systems, and keeping of required records and certificates of compliance;
(1.3) Regular and routine inspection of the Facility; identification and rectification of defects in the Facility;
(1.4) Maintenance of electrical, mechanical and civil infrastructure
(1.5) Fire protection systems maintenance;
(1.6) Occupant relations and interface management including; handling and addressing all complaints associated with the use of the Facility;
(1.7) Carrying preventive, remedial and/or upgrade works, repairs and/or replacements required for the upkeep and improvement of buildings and their components;
(1.8) Landscaping, vermin extermination and waste disposal;
(1.9) Domestic water plant operation and maintenance;
(1.10) General cleaning services refuse disposal management;
(1.11) Security monitoring systems;
(1.12) Fumigation and gardening services management
(1.13) Any other service as FHFL may specify whether in general or in reference to a specific part of the Facility.
(1.14) Constitution, training and management of a Tenants/Residents Association within three (3) years to take over and effectively manage the affairs of the estate.
*Please note that this list is not exhaustive.

QUALIFICATIONS OF THE COMPANY AND PERSONNEL QUALIFICATION
• Extensive experience and a proven track record in the facility management business
• Reliable coverage services
• Sound experience in similar projects
• Ability to provide 24-hours facility management services
• Real time administrative support systems
• Ability to respond immediately to emergency situations, whilst maintaining high quality standards of service delivery
• Presentation of full company profile and documentation

PROPOSAL GUIDELINES AND FORMAT
Prospective Consultants are required to submit their proposals in the following format:
(A) Approach and Strategy: Kindly provide a brief statement on the following.
• An understanding of the role as detailed in this RfP;
• Detailed workplan for execution of the tasks. Workplan shall include indicative dates of completion;
• A statement on your present capabilities as well as your plans in this regard.
• Information on your association with any other organization in the same business line in Nigeria.
• Would you envisage that any portion of this contract would be sub-contracted? What portion and why? Kindly let us know.
(B) Corporate Profile: This should include the following information:
• Corporate profile document of the firm.
• Details of the personnel of the firm.
• Incorporation documents.
• Compliance certificates.
• Any other relevant and statutory documents.
(C) Similar experience in past projects and their coverage area
Consultant shall demonstrate ability to render the required services by providing evidence of similar projects successfully executed, including references and recommendation letters:
• A listing of your top 3 clients in the last 3 years
• A statement of relevant experiences to the type of contractual arrangement the Fund is seeking.
(D) Transition Plan
The proposal shall include bidder’s plan for the orderly assumption of responsibility for execution of the proposed facility services for the property.
This plan should address:
• Transition tasks to be pre-formed.
• Transition responsibilities (both bidder’s and the site)
• Timeline for all transition activities
• In addition, the plan should respond to the following:
• Please describe how your firm intends to handle the transition, including details on timing, work steps, staffing issues, and critical path.
• Provide a detailed transition plan, approach, work steps, staffing, timing, inventory analysis, understanding of condition, and understanding of service requirements for the mechanical & electrical systems.
(E) Execution Plan
The proposal must include a detailed description of your firm’s plan to execute the services that are the subject of this RFP. This execution plan should explain how your firm intends to execute the particular services. The plan should identify those services that will be performed by an on-site staff that your firm would employ and those that would be performed by subcontractors to your firm, if any. Your firms intended on-site staff shall be fully detailed in a staffing plan or organization chart and supported with management resumes that follow the requirements listed in job descriptions.

The staffing plan shall identify all positions and number of personnel and shall include the following:
• Number of titles or functional descriptions of each position;
• An internal organization chart indicating the individuals and reporting structure your firm proposes to implement this assignment;
• Provide a complete description of the proposed organization that will be on-site and offsite in support of this service. Include all job titles, job descriptions and how they will interface with each other.

(F) Financials/Consultancy Fees
A schedule of proposed fees with indicative payment terms.
The following guidelines are provided for standardizing the preparation and submission of proposals. The intent is to assist respondents in the preparation of their submission and to assist FHFL by simplifying the review process providing standards for comparison of submissions. Statements submitted in response to this RfP shall include a complete response to the requirements in this section in the order presented.
Proposals shall be printed double-sided, submitted on standard A4 paper, with easy-to-read font size and style. Pages shall be numbered and bound (spiral/ three-ring binder). Tabbed dividers should separate and identify the response items described below.

Proposals shall contain the following information in the order listed:

(1) Introductory Letter
The introductory letter should be addressed to:
The Managing Director,
Family Homes Funds Limited,
3rd Floor Sinoki House,
Ademulegun Street,
CBD- Abuja.

The letter should include contact name, mailing address and telephone number of the Consultant. The cover letter shall include a statement acknowledging the conditions stated in the RfP, referencing any exceptions contained in the response, and be signed by the Consultant.

(2) The Proposal
The proposal shall include:
(a) Company Profile
(b) Approach and strategy
(c) Experience in past projects
(d) Financial (Consultancy Fee)

(3) Conflict of Interest Statement
Submit a statement regarding any activities or relationships of the responder that might create a conflict of interest for the responder or FHFL, and, if such activities or relationships exist, a description of the facts, legal implications, and possible effects sufficient to permit FHFL to appreciate the significance of the conflict and react as appropriate.

(4) Exceptions
Note any exceptions to the RfP requirements in their entirety.

(5) Supportive Information
This section may include graphs, charts photos, maps, references, etc., in support of the respondent’s qualifications and competence.

EVALUATION AND SELECTION CRITERIA
(1) Project Selection Process
In order to be considered, a proposal consistent with the terms of this RfP must be submitted. The responses to this RfP shall be reviewed by a nominated committee for completeness and evaluated against the stated criteria. The committee will then select and recommend the most competent Consultant to oversee the various construction projects around the states.
The selected Consultant will be invited to a kick-off meeting with the main objective of reviewing the work plan and expectations.

(2) Evaluation of Proposals
Applications will be evaluated, and the facility manager selected based on the following criteria:
Each bidder shall submit a technical proposal addressing the services required how they will meet the Centre’s requirements. The technical proposal will account for 70% of the total combined score. The proposal will be evaluated according to the following criteria:

(a) Approach and Strategy – This should demonstrate bidder’s understanding of the RfP and required services
(b) Organisational Structure – This should include details of internal structure, corporate profile and all compliance documents
(c) Similar Experience with Past Projects – To demonstrate bidder’s capacity and quality of projects/services delivered
(d) Transition Plan – This should include bidder’s detailed transition plan, approach, work steps, staffing, timing, inventory analysis, understanding of condition, and understanding of service requirements for the mechanical & electrical systems
(e) Execution Plan – The plan should identify those services that will be performed by an on-site staff and those by subcontractors, if any. Full details of on-site staff in a staffing plan or organization chart. It should also include proposed maintenance routines.

(A) Technical Proposal (70%)
(B) Financial Proposal (30%)

FHF being a Social Investment vehicle engages in the development of affordable homes at low cost. Our targeted beneficiaries include low income earners thereby necessitating the need to also ensure that facility management costs which are to be borne by the beneficiaries are affordable and within the affordability of this low-income target group. The ability to submit a competitive quote while ensuring the highest form of service delivery remains a key consideration for the Fund.

GENERAL POLICIES
(1) Late Proposals
Proposals arriving after the specified date and time will not be considered, nor will late proposals be opened. Each respondent assumes responsibility for timely submission of its proposal.
(2) Withdrawal or Modifications of Proposals
Any proposal may be withdrawn or modified by a written request signed by the respondents and received by FHFL prior to the final time and date for the receipt of proposals. Once the deadline is past, respondents are obligated to fulfill the terms of their proposal.
(3) Proposal Acceptance and Rejection
FHFL reserves the right to accept any proposal, to reject any and all proposals, and to call for new proposals, or dispense with the proposal process.
(4) Proposal Evaluation and Award
Evaluation will be made on the basis of the weighted scoring as noted in Evaluation and Selection Criteria section. The PAM Team and the set committee shall evaluate proposals submitted by project management firms.
Facility Management firms that were not selected shall be notified in writing.
(5) Request for Information
■ Respond completely, accurately and succinctly to each of the items below:
■ Provide the legal name of the entity submitting the proposal.
■ Identify the number of years that the entity has been in existence and the number of years that the entity has been providing facility services.
■ Provide the addresses of the headquarters location of the entity and of the location, if different, that would be responsible for the day-to-day performance of the services.
■ Identify the form of your business of the entity (corporation, partnership, limited liability company etc.) If a corporation, identify the state of incorporation and whether the corporation is public or private
■ Provide a summary of clients and properties for which you or your team are currently providing services. Indicate the number of years for which your firm has provided such services to these clients/properties.
■ Of those identified in the response to the above item, provide a list of (2) references for a similar assignment. Include the name of the client, the contact person for that client site, the contact’s titles, phone number and address. Of those two identify one (1) that the site could visit to obtain insight from the client’s point of view as to the capabilities of your firm.
■ Describe your firm’s approach to the assignment.
■ Detail any of your firm’s special or unique capabilities, technology or operating procedures that would be of direct benefit to the site.
■ List any affiliates or joint venture partners your firm intends to utilize in the performance of this assignment. Describe the nature of that utilization and how your firm will coordinate and interact with that affiliate or joint venture partner
■ Provide a listing of individual and/or company accreditations, certifications and memberships pertinent to this assignment.
■ Describe the quality assurance program that your firm would utilize on this assignment. Include copies of any certifications associated with the Quality program. Please identify the administrator of the program and how long it has been in effect. Discuss your process for monitoring level of service, complaint resolution and customer (occupant) satisfaction and measures to address any shortcomings. Explain and show examples of how you qualify suppliers and staff.
■ Discuss your processes and policies regarding utilization of personnel on an overtime basis. Explain how your firm provides cover for personnel on vacation, leave of absence, or illness.

SUBMISSIONS
• Each bidder must submit the technical proposal as a separate document from the financial proposal. Please refer to attached Schedule of Services for guidance.
• Please note that submissions must be sealed. Submissions not sealed will be rejected at the Front Desk.
• The bidder’s name and the RFP No. must be visible on the outer package of the submissions.
• Only proposals that fully address the mandatory services listed in the bidding requirement will be evaluated.
• Due date of submission: 15/02/2021 by 12:00pm. Proposals submitted after the stated date and time will be disqualified.
• Bidders must submit one signed original, two copies, and one electronic (USB flash drive preferred) copy of the proposals to Family Homes Funds Limited.
• Only shortlisted bidders will be contacted.
• Shortlisted bidders may be invited to make presentations to the evaluation team.
• Bidders that require visits to the site prior to submission should send an email to request for directions and contact information.
• The Schedule of services is attached below. One schedule is to be used per estate.
• Site layouts are available on request.
• For further clarifications and enquiries, please send email to procurement@fhfl.com.ng between 25th January 2021 and 5th February 2021. The subject of the email should read “ENQUIRY: RFP/HRADM/0020”.
• Bidders are strongly advised to refer to the RFP No in all correspondences.
Nothing herein shall obligate FHFL to award a contract to any responding application.

SCHEDULE OF SERVICES

DESCRIPTION QTY ONE YEAR DURATION AMOUNT
A SECURITY MONITORING SYSTEM Provide specialist subcontractor Security Services company for provision of security monitoring services within the estate to cover the number housing units.Security Operative monthly salary @ each 12months
B Make provision for purchase of security gadgets and tools 12 months
C PIPED WATER SUPPLY SYSTEM/WATER PLANT OPERATION & MAINTENANCE Allow for providing specialist subcontractor for preventive/corrective maintenance of all plumbing installations. Works to include pipes and fittings; tanks; pumps; sanitary fittings; drainage system and other accessories 12 months
E FIRE FIGHTING AND ALARM SYSTEM Allow for providing specialist subcontractor for the maintenance of all firefighting and alarm systems. Work to include bi-annual refilling of fire extinguishers, cylinder on wheels and fire hose reels 12 months
F FUMIGATION SERVICES Allow for the providing specialist subcontractor for Fumigations of the entire estate against pest and weeds, vermin and rodent extermination (Quarterly) 12 months
G CLEANING AND HOUSEKEEPING Allow for providing general cleaning of the whole estate inclusive of playground, to enhance effective operation by providing hygienic environment; work to include tendering of flowers, weeding, pruning, mowing, fertilizer application, watering of flowers. Cleaners/Gardener monthly Salary @ each 12 months
H SOLID WASTE COLLECTION Allow for collection of waste from the **** housing units weekly and carting away of same to dumpsite. Average monthly sum of ……………….. 12 months
L CLEANING/HORTICULTURAL MATERIALS Allow for purchase of cleaning, landscaping and horticultural materials for the premises to enhance hygienic environment; work to include and the like including equipment and tools required for effective operations 12 months

TO SUMMARY:
DESCRIPTION QTY DURATION AMOUNT
H CIVIL INFRASTRUCTURE AND EXTERNAL WORKS Allow for carrying out Maintenance works on road network to include grading and compacting, and other maintenance works for driveway/walkway and fencing. 12 months
I ELECTRICAL INSTALLATIONS Allow for proving preventive/corrective, maintenance of all electrical installations; work to include external lighting, panel, distribution boards, fittings, cabling, and replacement of fluorescent and incandescent bulbs, electricity maintenance on water plant operation system, etc. provision should be made for store items. 12 months
J REIMBURSABLE EXPENSES Allow for the following reimbursable expenses (to be supported by invoices/receipts)Resident staff (Number, quality and CVs of proposed staff to be supplied)Onsite Facility Supervisor -per monthAssistant Facility Supervisor – per month 12 months
Local Running(for emergency case) Ditto
TO SUMMARY:
Total to General Summary B/F:
Add:10 % Facility Management Fees
TOTAL

BILL NR. DESCRIPTION AMOUNT (N:K)
NR. 1 PREAMBLE AND SERVICES ITEMS CONTINGENCIES: include 5% (Five percent) for emergency (unplanned) repairs and additional services to be expended as approved by Family Homes Funds Limited
TOTAL TO FORM BID

You need to login to view the rest of the content. Please . Not a Member? Join Us

OYO STATE MINISTRY OF TRADE, INDUSTRY, INVESTMENT AND COOPERATIVES-

REQUEST FOR EXPRESSION OF INTERESTS (EOIs) TO MANAGE FOUR (4) STATE GOVERNMENT OWNED BUSINESS COMPLEXES

OYO STATE OF NIGERIA
MINISTRY OF TRADE, INDUSTRY, INVESTMENT AND COOPERATIVES
REQUEST FOR EXPRESSION OF INTERESTS (EOIs) TO MANAGE FOUR (4) STATE GOVERNMENT OWNED BUSINESS COMPLEXES

1.0 BACKGROUND:
Pursuant to the Oyo State Government’s commitment to ensuring that all her Business Complexes operate at an optimal level of standard, the Ministry hereby requests applications from qualified and experienced Professional Property Managers in managing four (4) Business Complexes listed hereunder:

(i) Bola Ige International Business Complex, New-Gbagi, Ibadan;
(ii) Adamasingba Business Complex, Adamasingba, Ibadan;
(iii) Oke-Bola Business Complex, Oke-Bola, Ibadan; and
(iv) Ultra-Modern Business Complex, Ogbomoso.

2.0 AVAILABLE FACILITIES IN THE BUSINESS COMPLEXES
There are different categories of facilities in the Business Complexes ranging from Shops, Warehouses, Offices, Abattoirs, Canters, Open Stalls e.t.c. with social amenities such as Borehole Water Facilities, Toilets, Access Roads, Motor Parks, Management Offices, Police Posts, Fire Service Stations, Refuse Dump Sites etc.

You need to login to view the rest of the content. Please . Not a Member? Join Us

MOBIL PRODUCING NIGERIA UNLIMITED-

TENDER OPPORTUNITY: PROVISION OF FIELD INTEGRATED FACILITIES MANAGEMENT SERVICES

MOBIL PRODUCING NIGERIA UNLIMITED
AN EXXONMOBIL SUBSIDIARY
OPERATOR OF THE NNPC/MPN JOINT VENTURE
TENDER OPPORTUNITY:
PROVISION OF FIELD INTEGRATED FACILITIES MANAGEMENT SERVICES
NIPEX TENDER NUMBER: MPN. 00000188

1.INTRODUCTION
Mobil Producing Nigeria Unlimited (MPN), Operator of NNPC/ MPN Joint Venture plans to engage the services of a competent and qualified contractor, for the Provision of Integrated Facilities Management Services at Company Locations to support her operations within the NNPC/ MPN Joint Venture (JV) acreage for an anticipated contract term that will be two (2), three (3) or five (5) years. Final Contract term will be at the sole discretion of the JV at the time of Contract Award.

2.SCOPE OF WORK
The scope of work includes but not limited to the following:
i.Housekeeping – Janitorial, Landscaping Maintenance, Pest Control/Fumigation etc.
ii.Furniture Maintenance, Security Sangers Maintenance, Potable water supply
iii.Cable TV / DSTV, Internet Services
iv.Structural/Building Façade/Civil Maintenance & Repair – Painting /Touch up, Carpentry, Roofing Systems, Exterior Preventive Maintenance
v.Mechanical Maintenance – Life safety Systems, Atrium Hoist System, HVAC, cold rooms etc.
vi.Plumbing including – Pumping System, Boreholes, Storage, Treatment Plant, Sewage Treatment Plant vii. Fire Protection- Fire Sprinkler System (Wet & Dry), Fire Alarm
vii.Electrical Maintenance – Medium/High Voltage Switchgears, Power Distribution Systems.

You need to login to view the rest of the content. Please . Not a Member? Join Us

UNITED NATIONS DEVELOPMENT PROGRAMME (UNDP)-

INVITATION TO BID FOR THE PROVISION OF TECHNICAL BUILDING & FACILITIES MAINTENANCE SERVICE AT UN HOUSE ABUJA.

INVITATION TO BID

The UNITED NATIONS DEVELOPMENT PROGRAMME (UNDP), on behalf of the UN System in Nigeria, invites bids from qualified companies /firms for the Provision of Technical Building & Facilities Maintenance Service at UN House Abuja.

The details of the invitation to bid can be found on http://procurement-notices.undp.org/ with the heading “Technical Building & Facilities Maintenance at UN House Abuja”

The ITB must be submitted in the format specified in the ITB solicitation documents which can also be downloaded on https://etendering.partneragencies.org and lookout for Event ID: ITB 2020081

All Bids must be received latest by 6:00AM EDT on 25th September 2020 on UNDP’s tendering platform https://etendering.partneragencies.org

You need to login to view the rest of the content. Please . Not a Member? Join Us

ECOWAS PARLIAMENT-

INVITATION FOR BIDS FOR PROCUREMENT OF CLEANING, MAINTENANCE AND FACILITY MANAGEMENT SERVICES FOR ECOWAS PARLIAMENT HEADQUARTERS OFFICE COMPLEX

ECOWAS PARLIAMENT
INVITATION FOR BIDS
PROCUREMENT OF CLEANING, MAINTENANCE AND FACILITY MANAGEMENT SERVICES FOR ECOWAS PARLIAMENT HEADQUARTERS OFFICE COMPLEX
PROCUREMENT NUMBER: EP/WKS/LCB/2020/01

ECOWAS Parliament has allocated funds for the procurement of cleaning, maintenance, and facility management services for the ECOWAS Parliament Headquarters office complex and now invites sealed bids from eligible bidders for the said service including all ancillary facility management equipment.

Bidding is open to all first-class contractors who can provide documentary and practical evidence that they have executed similar contracts of International institutions both in-country and in the ECOWAS region.

You need to login to view the rest of the content. Please . Not a Member? Join Us

USAID INTEGRATED HEALTH PROGRAM (IHP)

– REQUEST FOR PROPOSAL FOR PROVISION OF JANITORIAL SERVICES FOR USAID INTEGRATED HEALTH PROGRAM (IHP) IN ABUJA, BAUCHI, EBONYI, KEBBI AND SOKOTO STATES OFFICES UNDER USAID INTEGRATED HEALTH PROGRAM

USAID INTEGRATED HEALTH PROGRAM (IHP)
REQUEST FOR PROPOSAL (RFP)
RFP REFERENCE NUMBER: NUMBER IHP- 2020-006-RFP004
TITLE: PROVISION OF JANITORIAL SERVICES FOR USAID INTEGRATED HEALTH PROGRAM (IHP) IN ABUJA, BAUCHI, EBONYI, KEBBI AND SOKOTO STATES OFFICES UNDER “USAID INTEGRATED HEALTH PROGRAM”

1. OVERVIEW
USAID’s Integrated Health Program (IHP) would like to invite eligible firms to submit offers for Provision of Janitorial Services for USAID Integrated Health Program (IHP) In Abuja, Bauchi, Ebonyi, Kebbi and Sokoto States offices.

The Vendors must demonstrate capacity, based upon technical expertise, management capability and financial resources.

Palladium intends to award a contract to the lowest responsive and responsible bidder.

RFP Submission Requirements/Evaluation
• A Bid detailing the unit price only in the template below;
• Certificate of Incorporation
• Profile of the company
• Tax Identification Number (TIN) and Tax Clearance Certificate for 2017, 2018 and 2019
• Bank details/Financial capabilities
• Cover letter explaining interest to be a contracted vendor or supplier
• Three (3) References from current or past clients (at least in the last one year)
• Current copies of certificates from relevant Govt Agencies (at least 3)
• Copy of Pension Certificate Registration.

You need to login to view the rest of the content. Please . Not a Member? Join Us

MINISTRY OF HEALTH, LAGOS STATE

– INVITATION FOR EXPRESSION OF INTEREST (EOI) FOR THE ENGAGEMENT OF FRANCHISE COMPANIES FOR THE MONITORING OF HEALTH FACILITIES IN LAGOS STATE

LAGOS STATE GOVERNMENT
(MINISTRY OF HEALTH)
HEALTH FACILITY MONITORING AND ACCREDITATION AGENCY
INVITATION FOR EXPRESSION OF INTEREST (EOI) FOR THE ENGAGEMENT OF FRANCHISE COMPANIES FOR THE MONITORING OF HEALTH FACILITIES IN LAGOS STATE

1. BACKGROUND
The Health Facility Monitoring and Accreditation Agency (HEFAMAA) was established by the Health Sector Reform Law 2006 with the mandate to improve the quality and efficiency of health care services to residents of Lagos State. Specific functions of the Agency are highlighted below:

(1) Set the required minimum standards for the operations of public and private health facilities in Lagos State;
(2) Accredit, inspect, monitor and license all health facilities;
(3) Evaluate performance based on set standards by carrying out at least a monitoring visit twice a year to a health facility;
(4) Coordinate the collection and dissemination of data on performance indicators;
(5) Process applications for registration submitted to the Agency by any person;
(6) Inspect the premises to be registered and collate all necessary information on registered health facilities in the State.

You need to login to view the rest of the content. Please . Not a Member? Join Us

UNDP COUNTRY OFFICE – NIGERIA

– REQUEST FOR PROPOSAL FOR SUPPORT TO SUSTAINABLE WASTE MANAGEMENT AND ENVIRO

SUPPORT TO SUSTAINABLE WASTE MANAGEMENT AND ENVIROProcurement Process :RFP – REQUEST FOR PROPOSALNGA10 – 0000005688   Click here to participateOffice :UNDP COUNTRY OFFICE – NIGERIADeadline :29-May-20 @ 07:00 AM (New York time)Posted on :18-May-20 @ 10:15 AM (New York time)Development Area :CONSULTANTSReference Number :65986Link to Atlas Project...

Read More

Password reset link will be sent to your email