SHELL NIGERIA EXPLORATION AND PRODUCTION COMPANY LIMITED
CO-VENTURE PARTNERS: NNPC, EXXONMOBIL, NIGERIAN AGIP EXPLORATION
INVITATION FOR PRE-QUALIFICATION ENGINEERING, PROCUREMENT AND SUPPLY OF STATIC AND DYNAMIC UMBILICALS FOR BONGA SOUTHWEST APARO PROJECT (EPC 4)
TENDER REF: CWA117423
NIPEX TENDER NUMBER: NIPEX.A.260212.0008
NCDMB CERTIFICATION NUMBER: ES/NCDMB/UPD/SNEPCO-EOI-100706/100226/BONGA SOUTH WEST APARO (BSWA) PROJECT
1.0 INTRODUCTION
Shell Nigeria Exploration and Production Company (SNEPCo) as Operator of the Bonga South West Aparo (BSWA) Unit Area (straddling OMLs 118/132/140 block boundaries), invites interested and reputable companies to indicate an expression of interest to be considered for participation to tender for the supply of static and dynamic umbilicals for the Bonga Southwest Aparo field development Project.
The project is an oil development located about 135 kilometres offshore Nigeria in water depths up to 1400 metres. The development is based on a new hub, with a standalone spread-moored FPSO with a nameplate oil processing capacity of 150,000 bopd and 1.8 MMbbls nominal storage capacity. The Phase 1 development will be through deep water subsea network consisting of 12 Production and 11 Water Injection Wells, 26km of production flowlines, 14km of water injection flowlines, 100km Gas Export Pipeline and 35km of in-field Umbilical’s (note: lengths are approximate and will be subject to respondents’ final field layout development).
The scope of the Umbilical EPC (EPC 4), subject of this EOI request, includes the supply of static and dynamic umbilicals.
SNEPCo hereby invites only capable, reputable and competent Nigerian and qualifying International Companies (herein referred to as “Respondents”) with the requisite and demonstrable expertise, experience, skilled manpower and technology to a response in accordance with this notice for expression of interest. Thereafter, for those companies meeting SNEPCo requirements, shortlisting and inclusion in the bid list.
Related EPC Packages for BSWA Project, which are subject of separate EOI requests include:
EPC2: Provision of Engineering, Procurement, Construction and Installation (EPCI) Services of Pipelines, Flowlines, Risers and Installation of Subsea Hardware and Umbilicals.
EPC3: Provision of Engineering, Procurement, Construction (EPC) Services of Subsea Hardware.
EPC5: Provision of Engineering, Procurement, Construction and Installation (EPCI) Services of Single Point Mooring (SPM) and Offloading Systems.
Please visit the Nigerian Petroleum Exchange Portal www.nipex-ng.com for further details.
2.0 SCOPE OF WORK/SERVICE REQUIREMENT
The scope of work shall include but not limited to the design, engineering, procurement, fabrication, manufacturing and assembly, testing, integration, preservation, storage, load out and provision of support for offshore hook-up, installation, pre-commissioning, commissioning and start up for the 35km of static and dynamic Subsea Umbilicals, including all appurtenances. It also includes project management and interface management within and across contract boundaries.
3.0 MANDATORY REQUIREMENT
3.1 Confirm Company is registered in Nigeria and provide address of registered office in Nigeria and name of Legal Entity; If Company is not registered in Nigeria, provide documentary evidence of a liaison/partnership with a Nigerian registered Company (if Respondent is not a Nigerian registered entity). If Respondent is a subsidiary of a Holding Company, provide Name and address of the Ultimate Holding Company, Respondent’s office for this work.
You need to be logged in to view the rest of the content. Please
Log In. Not a Member?
Join Us
No Comments
Sorry, the comment form is closed at this time.